| Home |
| News |
| Ports |
| Ports Authority |
| Investments |
| Offer for investors |
| Gallery |
| Site Map |
| Maps of the port |
Contact
Szczecin and Swinoujscie
Seaports Authority
Bytomska 7
70-603 Szczecin
tel. (+48 91) 430-82-20
fax. (+48 91) 462-34-12
info@port.szczecin.pl
| Construction of the port infrastructure on Katowicki Peninsula in the port in Szczecin |
|
|
The project encompasses construction of a ship dock 240 m in length for ships with a draught of 9.15 m and the construction of a barge dock 80 m in length. The project is a continuation of the stocking complex of Katowice Peninsula. So far the ground has been enabled and Cłowa Street has been built. Completion of the project enables access from the water side to the presently unused ground of 16 ha. Planned period of completion - 2011-2013.
|




